Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.
Rough sawn cedar siding installation.
The cedar siding is first acclimatized by storing on stickers.
The single course 90 long profile minimizes waste during installation especially around dormers and peaks.
If you choose to install channel siding vertically be sure to bevel cut the ends and install so water is directed to the outside.
Ordinary rough sawn boards are best installed as vertical siding which ensures that moisture will not collect on horizontal surfaces.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.
Channel rustic 1x10 cedar siding rough face cust select grade.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Available in tando solid color series and tando natural color series.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
For the beleveld lap siding we used flood cwf on the rough side facing out.
Air or kiln dried siding that has been kept dry can be installed immediately.
Moisture can however seep into joints where two vertical.
The boards were pre coated on all other sides before installation.
Painted siding 1x10 channel rustic lap cedar.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board facing the street side of the house and overlapping the edge of the adjoining.
This is particularly important for vertical installation.
Lap siding can be installed horizontally or vertically.
Log in or create an account to post a comment.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.